Rochdale, Greater Manchester
School Commercial Kitchen Refurbishment
Commercial refurbishment of a school kitchen in Rochdale, completed within the six-week summer holidays — all industrial catering equipment stripped out, the floor renewed with a damp-proof membrane and Polyflor anti-slip safety flooring laid throughout, ready for the new term.
Get a QuoteThis commercial project involved refurbishing the main kitchen of a school in Rochdale. The work had to be completed within the six-week summer holiday window so the kitchen was ready for use when pupils returned in September.
All the industrial-sized catering equipment was taken out and the floor was fully prepared. The existing floor was renewed with a damp-proof membrane before the new surface went down.
Polyflor commercial anti-slip safety flooring was then laid throughout — a hard-wearing, hygienic surface designed for busy commercial kitchens where slips are a real risk. The kitchen was finished and handed back on time for the new school term.
Project highlights
- School kitchen completed within the 6-week summer holidays
- All industrial catering equipment stripped out
- Floor fully prepped and renewed with a damp-proof membrane
- Polyflor anti-slip safety flooring laid throughout
- Hygienic, hard-wearing finish for a commercial kitchen
- Handed back ready for pupils returning in September